After the installation of the floor stone care wet patch, there is a gap between the stone and the bonding layer, or the bonding layer and the base layer are not densely adhered. When the tapping is light, the sound of the drum is heard, so it is often called the floor stone hollow drum phenomenon. Floor stone cleaning is also a concern. So, how to clean the floor, how to deal with the empty drum? Next, follow the decoration home network Xiaobian to learn about the relevant content!
First, the floor stone cleaning steps
Dust off the stone floor regularly, if possible once a day. The dust removal frequency is determined according to the flow of people. Use a wet mop to clean the floor and use stone soap if necessary. You can also just wash with water. Re-polished the stone floor every two or three years, or ask an expert to polish. When you realize that the stone floor has begun to fade, you need to re-polish. In the event of a spill, clear it immediately. Repair the deep scratch on the stone floor, it is best to ask the expert to repair it, once it is found to be processed in time.
Second, the ground stone hollow drum treatment method
1. For the empty drum stone that needs to be repaired, determine the orientation and quantity of the drill hole. First, use the electric drill to install the hard alloy insert bit to drive the 5mm hole. It should be noted that the drill bit should be inclined downward at a 15 degree angle to prevent the epoxy resin slurry from flowing out of the hole after grouting. After the hole is drilled, the dust in the hole is removed by an air compressor. The ash-removing air machine should be inserted into the bottom of the hole so that the dust will escape from the hole with the compressed air.
2. Secondly, epoxy resin slurry is produced. Epoxy resin, dibutyl phthalate, curing agent, cement are proportioned. Mix the epoxy resin and dibutyl phthalate before mixing, then add the curing agent to mix, then add the cement and mix well, pour into the grouting machine to use.
3, again is to carry out grouting anchoring. When the resin gun is used to fill the resin slurry in the hole, the tip of the gun should be deepened, and the tip of the gun should be gradually withdrawn outward during the filling. After the slurry is filled, the steel anchor bolts are placed. In order to improve the bonding effect, the bolts should be made into a thread type, and a hex nut is screwed at one end to firmly hold the marble plate.
4. Before placing the bolts, in order to prevent the injected epoxy resin slurry from flowing out and polluting the marble surface, the lime plug can be used to block the hole. After the epoxy resin paste is solidified, the plugging is cleaned. Immediately after the resin slurry remaining on the surface of the stone, use acetone or xylene in time to clean the stone to avoid staining the floor.
5. After two to three hours of grouting, seal with white cement mortar. The color of the color paste should be as close as possible to the surface color of the repaired stone. After completing the construction of the empty stone stone care, after waiting for about one day, the surface of the epoxy resin slurry dried up, and then happily played with it.
The above is a detailed answer to the Xiaobian, I don't know if you are satisfied with the introduction of the decoration home network Xiaobian~ If you want to know more about the exciting content, please continue to pay attention to our life encyclopedia!
More related wonderful reading:
Floor stone polishing step floor stone waxing method
Office Plastic Floor Mats,Plastic Chair Mat,Plastic Office Mat,Plastic Office Mat
Jiangyin Yining E-Commerce Co., Ltd , https://www.pvcmatyining.com